Opening June 1st  2014
Unloading the Yurt
Building the platform
Putting the decking on
Yurt floor
Cleaning up
Putting up the wall
Installing roof rafters
Framing completed 
Rafter cover
Roof insulation
Exterior insulation
Interior 
Before the railing
Yurt walkway
Exterior from walkway
 Exterior completed
Exterior
More photos to follow as interior is completed. 
The yurt will have indoor plumbing, small kitchen, queen bed and is on the lake.
~Summer rental only~
Walls going up
Kitchen area
Building bathroom walls
Starting sheetrock
Completing electrical
Kitchen sheetrock
Heater installed
Bathroom ceiling / plumbing